Description

A transformer substation has been installed in the Kretinga district to connect the solar park to the LITGRID 110 kV overhead line. The substation is equipped with a 40 MVA 30/110 kV transformer, ensuring efficient transmission of the generated electricity to the grid. Reliable connection to the high-voltage grid increases the stability of the entire solar park’s operations. This infrastructure is an important part of the project, which strengthens its technical reliability and long-term value. This provides additional assurance to investors regarding smooth energy transmission and sustainable project operations.

Project informacion

Year
2026
Place
Kretinga distr.
post23